CB-2
Automated Concrete Batching System
Version 2.0
Installation/Operation Manual
93603
Zobrazit stránku 0
1 2 3 4 5 6 ... 13 14

Shrnutí obsahu

Strany 1

CB-2Automated Concrete Batching SystemVersion 2.0Installation/Operation Manual93603

Strany 2

6 Installation/Operation Manual2.1 Important Notes2.1.1 Two Power SourcesThe CB-2 requires two separate power sources to run. The power cord that cam

Strany 3

Installation/Operation Manual - Installation 72.2 CB-2 Main Junction BlockThe CB-2 main junction box provides access for outside power to be brought

Strany 4

8 Installation/Operation Manual2.3 Load CellsThe CB-2 comes pre-wired at the factory. Figure 2-4 shows the loadcell connections on the lower row.

Strany 5

Installation/Operation Manual - Installation 9For units containing three load cells, the following table and diagram illustrate the load cell connect

Strany 6

10 Installation/Operation Manual2.3.1 Serial CommunicationsThe CB-2 supports RS-232 communications and their connections are shown in Figure 2-6, bel

Strany 9

ContentsAbout This Manual ...

Strany 10

2 CB-2 Installation Manual6.4 Diagnostics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Strany 11

Installation/Operation Manual - Safety 1About This ManualThis manual is intended for use by service technicians responsible for installing and servic

Strany 12

2 Installation/Operation Manual1.0 IntroductionThe CB-2 is a versatile, efficient concrete batching control system ideal for ready-mix, central mix,

Strany 13

Installation/Operation Manual - Introduction 3Front PanelThe 920i front panel, shown in Figure 1-1, consists of a 27-button keypad with a large backl

Strany 14

4 Installation/Operation Manual1.2 Indicator OperationsThe CB-2 does not allow the 920i to execute any of its standard operations like Gross/Net, Uni

Strany 15

Installation/Operation Manual - Installation 52.0 InstallationThis section explains the main junction box, load cell, digital I/O, and serial communi